wrong mass flow with simple-shift time delay
Closed this issue · 0 comments
HannesWeska commented
The simple-shift time delay creates a wrong mass flow for the streams "Mischung Nr 8 Eingang Abschnitt2+Sieb Nr 22 45/x (2)" and "zerkleinertes Material Nr. 1.01 (2)". Calculation for the following streams seems to be correct ("Siloabzug Nr 4.1" and "Sieb Nr 22 45/x", "Ausgang Abschnitt 2 (Sieb Nr 22 0/45)"). Using norm-based time delays solves the problem.
Materials.dmdb.zip
Abschnitt_2.dflw.zip