Run tests dependent on whether phone is connected or not.
a-t-0 opened this issue · 0 comments
a-t-0 commented
If the phone is not connected some tests will yield a different result/may fail.
- Identify in which post installation tests a lack of control over the connectedness of the phone may occur.
- Identify in which post-setup tests a lack of control over the connectedness of the phone may occur.
- Account for possible lack of control over the connectedness of the phone in post installation tests.
- Account for possible lack of control over the connectedness of the phone in post setup tests.
- Indicate the thoroughness of the tests based on the connectedness of the phone throughout testing.