MATPOWER/most

add load-following ramp reserves entering initial period

rdzman opened this issue · 1 comments

Modify the definition of the load-following ramp reserves to include the transition from the initial state into period 1.

Currently, feasibility for this particular transition is assumed to be handled by the period 1 generator limits.

Fixed in #26.