WikiWatershed/pollution-assessment

Resolve workflow to automate protected land future avoided pollutant loads

Opened this issue · 1 comments

Related to #4

Drexel team to decide best and most efficient workflow to automate protected land future avoided pollutant loads

Resolve if BMP API "land use change" archetype could be modified

OR

if LPIA modeling code can be used to calculate lbs avoided from outputs from /api​/fzs_buildout​/ parcel results

Discussion from today's PA2 meeting:

Use BMP api to compute “load increase if developed” which would be propagated down

  • The delta of this and the existing load would be loads avoided
    • “load increase if developed” = future load - current load
  • Perform this step using both the OSI predictions and Clare’s prediction
    • Use whichever is greater