amosproj/amos2023ss03-qachat

create the demo day video

tkonheiser opened this issue · 1 comments

User story

  1. As a project team
  2. We need a demo day video
  3. So that our project can be presented on the demo day

Acceptance criteria

  • a 3 minute video is created
  • video is approved by QAWare, if QAWare information is included
  • the demo day presentation slides are finalized
  • the video contains the demo day presentation slides
  • the video contains a demo of the software
  • the video is narrated
  • the video uses a common codec
  • the video is uploaded to the Deliverables folder (sprint-12/demo-day-video.mkv)

Definition of done (DoD)

  • Acceptance criteria are met.
  • Work products are uploaded to the Github repository.
  • A pull request is created for each related branch.
  • The work products in the pull requests are reviewed.
  • The corresponding branches are merged and closed.
  • The bill of materials section of the planning documents is updated.
  • All defined conventions are complied with.

DoD general criteria

  • Feature has been fully implemented
  • Feature has been merged into the mainline
  • All acceptance criteria were met
  • Product owner approved features
  • All tests are passing
  • Developers agreed to release