[Fix] Task Status Not Pre-filled During Edit, Causing Error on Save Without Re-selecting Status
Closed this issue · 0 comments
samuelmbabhazi commented
When editing a task, the status field is not pre-filled with the current status of the task. This results in an error if the user attempts to save the task without manually re-selecting the status.
https://www.loom.com/share/43901495027b4ec583f03a88fefc6730?sid=513c434c-40ae-4961-a0fb-d18aaaec19fe