Multi job main job failes even after setting the sub jobs to ignore failure.
Opened this issue · 0 comments
syedsfayaz commented
Hi
I am using multi job plugin 1.29. I have a main job which constitutes of multiple multi jobs added.
In a multi job template there are multiple sub jobs added which are part of our build. Some builds are not critical and can be ignored if failed. But even after setting it to ignore the Main job status is failed.