singularity-energy/open-grid-emissions

Plant-specific gross to net conversion issues

grgmiller opened this issue · 0 comments

The gross to net conversion for two plants (plant 55799 in 2019, and plant 57865 in 2021) is likely incorrect due to data inconsistencies between reported gross generation in CEMS and reported net generation in EIA-923 for these plants.

Specifically, the warnings being raised are:

2019

WARNING: There are 1 plants where calculated annual net generation does not match EIA annual net generation.
              net_generation_mwh_eia  net_generation_mwh_calc  pct_error
plant_id_eia
55799                        60314.6                33973.256  -0.436732

2021

WARNING: There are 1 plants where calculated annual net generation does not match EIA annual net generation.
              net_generation_mwh_eia  net_generation_mwh_calc  pct_error
plant_id_eia
57865                        25581.5               345104.711  12.490402