ssvlabs/ssv-spec

Do Proposal's pre-consensus as soon as possible in the start of the spec

Opened this issue · 0 comments

Through the beacon node, we get proposal duties at the beginning of the epoch. Thus, we can do the pre-consensus step as soon as possible, even before the slot starts. This will save us some time to submit the block for the proposal duty.