General features:
-Based off of Voron V1
-3 Z Motors
-dual MGN12 X axis
-dual CAN toolhead/Huvud board
-full 4040 frame
-Modified Markforgedish kinematics, existing CoreXY belts are used for X1/X2 for toolheads. Two Y belts with two Y motors added for moving X axis, stacked just below the existing lower belt path
-Possibly some sheet metal to make XY joints stiffer and make it easier to secure belt
-No ETA, just a random fun project! Started fall 2020
Belt path (red lines show two y axis belt locations)
Location of Y belt (red circled part secured to XY joint)
3 Piece XY joint with toothed path for securing GT2 belt:
Belt path location:
Front idler Y belt toothed idler location: