/requirements

WP2: Top Level Project for openETCS requirements

Primary LanguageD

WP2 - Requirements

Work Package 2 Top Level Project

Folder Organization Proposal for WP2

The folders are organized the following way in the requirement repository.

  • Requirements : main requirement repository
    • D2.1 --- State of the art : report on existing methodologies
    • D2.2 --- State of the art : report on CENELEC
    • D2.3 --- Definition of the overall process for the formal description of ETCS and the rail system it works on
    • D2.4 --- Definition of the methods used to perform the formal description
    • D2.5 --- Methods and tools benchmarking methodology
    • D2.6-9 --- Set of requirements for the project (contains D2.6, D2.7, D2.8 and D2.9)
    • D2.7-Technical_Appendix --- Description of the API
    • MinutesOfMeetings : Self explanatory
    • Workspace : All temporary documentation that does not fit anywhere
    • Tools : Self explanatory
    • Reference : Reference set of approved documents

The documents in progress should be found in Requirements/D2.x. After approval, the approved version is copied in the Reference. In this reference repository, only the current applicable version in pdf format shall be found.