The purpose of this project is to refactor the existing Microsoft VBA code in a way that we can collect any stocks information in either of 2018 or 2017 years to understand if the stocks are worth investing

Stock-Analysis

You can find the Analysis file here: VBA Challenge - Stock Analysis

Overview of Project

Purpose

The purpose of this project is to refactor the existing Microsoft VBA code in a way that we can collect any stocks information in either of 2018 or 2017 years to understand if the stocks are worth investing. This process was already done in a format which worked perfectly for dozen of stocks; however, the goal of this challenge is to increase the effeciency of our existing code.

Results

Analysis

I began with copying the starter code provided with the challenge guideline and edited the sections numbered as following:

'1a) Create a ticker Index
tickerIndex = 0

'1b) Create three output arrays
Dim tickerVolumes(12) As Long
Dim tickerStartingPrices(12) As Single
Dim tickerEndingPrices(12) As Single


''2a) Create a for loop to initialize the tickerVolumes to zero.
For i = 0 To 11

    tickerVolumes(i) = 0
    tickerStartingPrices(i) = 0
    tickerEndingPrices(i) = 0
    
Next i
    
    
''2b) Loop over all the rows in the spreadsheet.
For i = 2 To RowCount

    '3a) Increase volume for current ticker
    tickerVolumes(tickerIndex) = tickerVolumes(tickerIndex) + Cells(i, 8).Value
    
    
    '3b) Check if the current row is the first row with the selected tickerIndex.
               
    If Cells(i, 1).Value = tickers(tickerIndex) And Cells(i - 1, 1).Value <> tickers(tickerIndex) Then
            
            tickerStartingPrices(tickerIndex) = Cells(i, 6).Value
        
    End If
    
    '3c) check if the current row is the last row with the selected ticker
     'If the next row’s ticker doesn’t match, increase the tickerIndex.
    
    If Cells(i + 1, 1).Value <> tickers(tickerIndex) And Cells(i, 1).Value = tickers(tickerIndex) Then
            
            tickerEndingPrices(tickerIndex) = Cells(i, 6).Value
        
    End If
        

        '3d Increase the tickerIndex.
        
        If Cells(i, 1).Value = tickers(tickerIndex) And Cells(i + 1, 1).Value <> tickers(tickerIndex) Then
            
            tickerIndex = tickerIndex + 1
                 
        End If

Next i

'4) Loop through your arrays to output the Ticker, Total Daily Volume, and Return.
For i = 0 To 11
    
    Worksheets("All Stocks Analysis").Activate
    Cells(4 + i, 1).Value = tickers(i)
    Cells(4 + i, 2).Value = tickerVolumes(i)
    Cells(4 + i, 3).Value = tickerEndingPrices(i) / tickerStartingPrices(i) - 1   
    
Next i

Here is the results of our analysis for both years:

VBA_Challenge_2017 VBA_Challenge_2018

Based on the results, almost all stocks had a significant drop down in their returns for the year 2018. However, we can say that the stock with ticker name ENPH had a great return for both years, therefore, this could be a great stock for Steve's parents to invest in.

Summary

  1. What are the advantages or disadvantages of refactoring code? The greatest advatange was the decrease in our macro run time. Based on screenshots below, you can see that the original macro run time was 0.8 second for both years:

Original_code_2017_Run_Time Original_code_2018_Run_Time

However, once we did the refactoring, the macro took only 0.2 seconds to run which is a great improvement and what actually our client was looking for. Here are screenshots of the run time in our new refactored analysis:

2017_Run_Time 2018_Run_Time

  1. How do these pros and cons apply to refactoring the original VBA script? Refactoring has number of different pros. Not only it makes a cleaner and more organized code but also can be benefitial for other collaborators who might read our codes because of how straightforward and easy it is to follow and read. It will be also easier to debug and can increase our softwares effeciency. On the other hand, the refactoring can be really time consuming. For this challenge, we did not have as many lines of codes therefore it did not take much of a time but in real world and projects, we might have hundreds of code lines. There can be also a higher chance of mistakes because of complexity of the code.