Split "Operation Time (seconds)" in two: "Raise Time" & "Lower Time" ?
Closed this issue · 3 comments
rbswift commented
Would it be possible to split the Operation Time parameter as described because heavy shutters take considerably longer to raise/open than to lower/close due to gravity. Without this, for example, a 50% command via mqtt produces a markedly different resulting final position depending on the starting position.
Or any workarounds I haven't thought of?
Thanks.
clemorphy commented
Same question. It takes 29 seconds for my shutter to close, but 32 seconds to open. 2 operation times per shutter would allow to handle this.