- The Self Driving Challenge 2024 officially begins with a launch event on :
- February 12th at the RDW Lelystad test track. RDW Test Centre in Lelystad (TCL).
- June 14th 2024, the final challenge at TCL
- Weekly access to track possible
- "Gepard Kinderquad 1000w 48v Viper 7 Blue" (https://www.motorpromo.nl/kinderquads/elektrische-midi-quads/g/10454-blue-gepard-viper-7)
- Helmond / Eindhoven / Best / ??
- Teade Punter, Frans Fonville (Eindhoven) https://www.fontys.nl/Onderzoek/High-tech-embedded-software.htm
- Peter Dingemans (Tilburg)
- Bas Geleijns (Helmond Automotive ACE)
- E. vd Oetelaar, project lead
- Sieuwe Elferink, software lead
- Nik Robben, intern
- Kristian, graduation
- ??
- Fontys ICT (Lectoraat/Pulsed/Automotive?)
- Contact (I. Maas, https://www.tandemdrive.com/ )
- assign a person
- assign a person
- assign a person
- assign a person
- Power from Batteries: Main power source for vehicle operation.
- Power from Wall Socket during Development: Power supply during development phase.
- Battery Charging: Considerations for charging, choice between single or dual chargers for motor/control system separation.
- Battery Backup for Control Systems: Emergency power supply for control systems.
- Battery Level Sensing: Monitoring battery charge and telemetry to the control station.
- Power for Sub-Systems: Power supply for various subsystems.
- Remote Control, TeleOp, and RC during Development: Remote control and operation during development.
- Control of Motors (Speed, Torque, Wheel Odometry): Managing motor control including speed, torque, and wheel odometry.
- Control of Braking: Managing braking force.
- Control of Signals: Managing signals such as turn indicators and state signals (external display of status).
- Safety Measures: Safety measures like emergency stop on error and hard braking on power loss.
- CAN Bus Systems: Considerations for implementing and necessity of CAN bus systems.
- AI Module for Image Handling: AI module for image processing.
- Sensors: Various sensors like ZED2, LIDAR, RADAR, and ODOMETRY.
- Water Proofing (IP Rating): Waterproofing and IP rating of components.
- Additional Requirements and Considerations: Any other requirements and considerations relevant to the project.
- Team Collaboration: Strategies for effective team collaboration and task distribution.
- Communication Channels: Establishing clear communication channels for internal and external communication.
- Regular Meetings and Updates: Scheduling regular team meetings for progress updates and decision making.
- Documentation and Reporting: Maintaining comprehensive documentation and reports for tracking progress and troubleshooting.
- Skill Development and Training: Arranging training sessions for team members to develop necessary skills.
Overkoepelende thema's zoals Energievoorziening, Besturing en Veiligheid, Sensor- en Dataverwerking, en Overige Systemen.
-
Connector system Microfit-jr 3.0 Molex (never dupont arduino wires !!)
-
All wires 0.5mm2 or better
-
Should be modular and reliable
-
Make or buy => BUY when possible
-
Critical : limited time for project