Guira

Guira is a schedule querying language.
It allows querying sets of and checking individual dates against a schedule defined in the guira language.

Try in the browser

Installing

You need ocaml(version 4.02.0 or later) and findlib

make
make install

Optional extras

To generate javascript run make js (requires js_of_ocaml)

For the mysql plugin, run make mysql (requires mysql)

To run tests use make test (requires chibi-scheme)

make install will install whatever has been built. So if you only want the mysql plugin, just don't run make without a target.

Basic usage

To get the 3rd day from today

λ echo '(day 3)' | guira
2016-07-14

To check if the 14th of July in 2016 is 2 days from now

λ echo '(day 3)' | guira 2016-07-14
λ echo $?
0

Note that today is day 1, this can be changed with the '-s' flag, see below.

Using subselectors
All Mondays next month

λ echo '(month 2 (day mon))' | guira
2016-08-01
2016-08-08
2016-08-15
2016-08-22
2016-08-29

Combining conditions

λ echo '(year (or ad2017 ad2030) (day 3)))' | guira
2017-01-03
2030-01-03

Command line options

If DATE is given, the program is in check-mode. Otherwise it is in query-mode.

guira [OPTION...] [DATE]

  • -s, --start-date <date>
    This is the date from which dates will be queried if in query-mode
    and the date from which the n variable is calculated if used in the outermost selector.
    Defaults to today.

  • -e, --end-date <date>
    Last date to query, in check-mode this option is ignored.

  • -i, --interval (minute|hour|day|week|month|year)
    Interval at which dates should be checked in query-mode.
    All selectors in the query with greater precision than this interval will be ignored.
    Defaults to the precision of the query.

  • -f, --format <format>
    Format of output dates, accepts a subset of strftime format strings;
    currently implements a, b, d, F, H, m, M, S and Y.

  • -h, --help
    Prints a very helpful message.

Return codes

the program will exit with one of the following codes:

  • 0 - Signifies that the date is valid for the given query in check-mode. In query-mode it just means 'success'.
  • 1 - Given date does not match query string.
  • 2 - An error occurred, will be accompanied by a message on stderr.

Selectors

Available selectors are year, month, week, day, hour and minute.
A selector can be applied to a condition and a list of subselectors:

(month                ; selector
  (or jul oct)        ; condition
  (day 4)             ; subselector
  (day (or mon fri))) ; another subselector

If there are multiple subselectors, a date needs to match one or more of them to be valid.

A subselectors interval must always be smaller than the parent interval.

Everything after a ';' is ignored until a newline.

The following grammar specifications are extended BNF with an 'integer' terminal.

Grammar

selector ::= '(' interval [condition] {selector} ')'
interval ::= 'year' | 'month' | 'week' | 'day' | 'hour' | 'minute'

Conditions

Conditions can be combined with the or and and functions, these can be arbitrarily nested.
not will simply reverse a conditions effect.

Grammar

condition ::= expression
            | '(' 'or' condition {condition} ')'
            | '(' 'and' condition {condition} ')'
            | '(' 'not' condition ')'
            | '(' 'eq' expression expression ')'
            | '(' 'gt' expression expression ')'
            | weekday
            | month
            | 'ad' integer
            | 'leap'

weekday ::= 'mon' | 'tue' | 'wed' | 'thu' | 'fri' | 'sat' | 'sun'

month ::= 'jan' | 'feb' | 'mar' | 'apr' | 'may' | 'jun'
        | 'jul' | 'aug' | 'sep' | 'oct' | 'nov' | 'dec'

Expressions

When the condition is just an expression, it is implicitly compared to n for equality. n is the difference in terms of the current selectors interval between the start of the parent selector (for example Monday if the parent selector is week) and the current time.
So (week (day 2)) will pick the 2nd day since Monday, which is Tuesday.
If there is no parent selector, the start date is used.

Grammar

expression ::= 'n'
             | 'week-of-month'
             | 'day-of-month'
             | integer
             | '(' '+' expression {expression} ')'
             | '(' 'mod' expression expression ')'

The Javascript library

make js will produce a file named guira.js, this defines a function guira.

To use it call it with the reference date as the first parameter, the interval as second parameter, the query third, and lastly the date to check.

js> guira("2014-01-01", "day", "(day thu)", "2015-01-01");
true

The mysql plugin

make mysql will create a shared object called mysql-guira.so, this can be dynamically linked by mysql to expose a GUIRA() function.
make install will copy the file to [your mysql plugin directory]/guira.so
You need to run a CREATE FUNCTION query:

CREATE FUNCTION guira RETURNS INTEGER SONAME "guira.so";

And then the function can be used:

mysql> SELECT GUIRA("2010-01-01", "day", "(month (day (eq (mod n 3) 0)))", "2015-04-15") AS berd;
+------+
| berd |
+------+
|    1 |
+------+
1 row in set (0.00 sec)

it returns 1 if the query matches, 0 otherwise.