/4365-final

CS 4365 Final Project

Primary LanguageShell

4365-final

CS 4365 Final Project

File Descriptions

  • main.py: Selenium driver script for Emulab input
  • setup.sh: Infosphere project setup script
Date Checkpoint
2018-02-02 Emulab account setup
2018-02-08 Elba experiment execution tutorial completion
2018-02-14 Elba processing and analysis tutorial completion
2018-02-16 Project proposal submission
2018-02-20 Default tutorial results analysis
2018-02-25 Bash scripts for experiment setup and testing
2018-03-04 Multiple runs with results collection for 4-4-1-1 experiments
2018-03-09 Multiple runs with different configurations on other N-N-1-1 topologies
2018-03-18 In-depth analysis of experiment results
2018-04-12 Final report draft completion
2018-04-24 Submission of final deliverables