- Module 1: Setup AVS Connectivity
- Module 2: Deploy HCX for VM Migration
- Scenario
- Introduction
- Agenda for next 60 mins:
- Task 1 (Preconfigured) : Install VMware HCX on AVS Private Cloud
- Task 2 (Preconfigured): Download the HCX OVA to On-Premises vCenter
- Task 3 (Preconfigured) : Import the OVA file to the On-Premises vCenter
- Task 4: Deploy the HCX OVA to On-Premises vCenter
- Task 5: Obtain HCX License Key
- Task 6: Activate VMware HCX
- Task 7: Configure HCX and connect to vCenter
- Task 8: Create Site Pairing from On-premises HCX to AVS HCX
- Task 9: Create network profiles
- Task 10: Create compute profiles
- Task 11: Create a service mesh
- Task 12 Setup the Network Extension
- Task 13: Migrate a VM using HCX and vMotion
- Module 3: Setup SRM for Disaster Recovery
- Introduction
- Task 0 (preconfigured): Install SRM add-on in the protected and the recovery sites
- Task 1: Configure the production site (GROUP#-AVS1-SDDC)
- Task 2: Create a VM in the protected site
- Task 3: Create an NSX-T segment in the recovery site GROUP#-AVS2-SDDC
- Task 4: Configure a Site Pairing in Site Recovery Manager
- Task 5: Configure Inventory Mappings
- Task 6: Configure vSphere Replication and Recovery Plan
- Task 7: Test Recovery Plan
- Task 8: Run Recovery Plan
- Task 9: Reprotect the Migrated VM
- Task 10: Run Recovery Plan
- Module 4: Create and configure a Secure Hub to route traffic to the internet
riperez123/avs-workshop-step-by-step
This guide is based on MS CSU level Up workshop for https://github.com/Azure/Enterprise-Scale-for-AVS credits go to the entire Landing Zone v-team that worked creating the original guide