info.mapleve
Manufacturing Planner for Eve
Installation
Prerequisites
you need a Java 9 runtime
Download & Run
Get the zip file from the "releases" tab. Unzip and launch the start.bat
file. You cannot use the program yet, please follow the next step!
Eve Databases
Maple-VE needs the SDE database provided by CCP.
- Go to https://developers.eveonline.com/resource/resources and download the
sde-xyz.zip
file from the "Static Data Export" section. - Unzip
- Copy the files
blueprints.yaml
andtypeIDs.yaml
from thesde/fsd/
folder of the zip file to the base directory of Maple-VE (the directory where thestart.bat
file is located - Hit the reload icon on the top center of the application (behind the "SDE Database Status"); the program will try to find the files copied in the last step and show green checkmarks if successful. If an error occurs hover over the error sign for more details. Please note the type database is huge and it might take several seconds to load it.
Use
Copy a list of items in the leftmost text area. Currently only the "fitting" format is supported, i.e., each item has to be in a separate row and it is not possible to enter quantities such as 2x Myrmidon
. However it is possible to enter multiple fittings at once.
Example
[Myrmidon, Artillery Fit]
720mm Howitzer Artillery II
720mm Howitzer Artillery II
720mm Howitzer Artillery II
720mm Howitzer Artillery II
[Myrmidon, Half Empty Fit]
720mm Howitzer Artillery II
720mm Howitzer Artillery II
Myrmidon
will be aggregated into
3x Myrmidon
6x 720mm Howitzer Artillery II
Hit the reload icon above the leftmost text area to calculate the needed materials.
The center box will show a tree based breakdown of all needed materials
The right box will show the "components" needed for manufacturing, i.e., only the semi-finished materials (typically T1 modules)