DPSAM
Data Poor Stock Assessment Methods
You can run the current developer version by running the following command in R '''{r} runGitHub("DPSAM","smartell",ref="develop",subdir="/R/shiny/") '''
Table of contents
Structured Workplan
January 2015 Deliverable: Structured Workplan
- Set up code repository for DPSAM on github.
- Coordinate meeting with WPFMC staff (re: identify data sources & collaborators)
February 2015 Deliverable: meeting in Honolulu
- Meeting with WPFMC staff re: data and overview of the integrated modeling framework, access to code repository.
- Develop age-structured model with leading MSY-FMSY parameters & integrate into the Catch-MSY framework.
March 2015 Deliverable: conduct training workshop on ADMB in Honolulu
- ADMB-training workshop in Honolulu HI.
- Add routines to allow fitting auxiliary data (changes in mean size, trends in density, density estimates from UWVC surveys)
- Contribution to Wakefield symposium.
June 2015
- Develop web-based interface for running and viewing output from the DPSAM.
- Review CIE comments on previous Catch-MSY analysis and address to the extent possible in the DPSAM.
- Prepare preliminary report and address CIE review comments to the extent practicable.
July-August 2015
- Simulation test DPSAM model.
- Apply model to data poor stocks and compare results with existing methods.
September 2015
- Submit draft report to council for feedback
- Conduct training workshop for council & NMFS staff on the use of model and software.
October 2015
- Present model for WPSAR review, presentation to SSC.
November-December 2015
- Prepare final report
- Submit manuscript for peer-review publication
- Make open-source software and all source code available online.