Issues
- 0
Remove the DJ booth
#14 opened by jonnycampbell - 1
Install and upgrade the CNC machine
#28 opened by jonnycampbell - 0
- 0
- 1
Remove old signage
#15 opened by jonnycampbell - 3
Stock bar with beer
#11 opened by jonnycampbell - 0
Ensure that the building meets all safety procedures, including emergency lighting and exits.
#26 opened by chrismcclelland - 0
Organise EHO inspection of the Brewspace
#25 opened by chrismcclelland - 1
Remove the old tap brands from the bar
#24 opened by jonnycampbell - 1
- 1
Clean the tap lines.
#3 opened by chrismcclelland - 1
Name the bar
#18 opened by chrismcclelland - 0
Remove the graffiti from inside the bar
#5 opened by jonnycampbell - 0
Remove disco lights
#16 opened by jonnycampbell - 0
Arrange skip to remove rubbish
#23 opened by jonnycampbell - 1
There is no electricity.
#12 opened by chrismcclelland - 0
Find builders
#22 opened by jonnycampbell - 0
Get the keys
#21 opened by jonnycampbell - 2
Find office table
#13 opened by jonnycampbell - 0
Paint interior
#20 opened by jonnycampbell - 1
Get beer glasses.
#19 opened by chrismcclelland - 1
Send copper mirrors back to 1990
#8 opened by jonnycampbell - 1
Remove stage underneath the stairs
#9 opened by jonnycampbell - 0
It is cold. Fix the heating.
#2 opened by chrismcclelland - 0
- 0
- 0
Replace faux library with real library
#6 opened by jonnycampbell - 0
- 0
Fit out the Brew Lab
#7 opened by jonnycampbell