/progress-control-pcf

Primary LanguageTypeScriptMIT LicenseMIT

Progress Control

Description

This control will allow you to display an integer or a decimal as a % control.

Download

DOWNLOAD LATEST RELEASE

How to configure

  1. Add the control to the field that will contain the data split by your delimiter.
  2. The parameters of the control are explained below

Parameters

  1. Field (required) -> It is the field that will contain the data

  2. is100MaximumValue (required) -> Set if 100 is the maximum value for your field number.

  3. CSS Path (optional) -> This will allow to you to add your own styles to the component, if it is not set, it will show the ones that have been added by default. If you want to add your own styles, you need to pass to the parameter the path url of the css component as: /Webresources/vso/css/styles.css

How to edit the number

If you want to edit the number, just edit it through the number that is displayed inside the control. It will always add a % just for display reasons. You can edit the common javascript functionality of ...setValue()

Assets

Display

If you set the maximum value as FALSE Is Maximum Value False

If you set the maximum value as TRUE Is Maximum Value False

Styles

You can edit the styles if you follow the content as the current .css.