WeFlex Product Development Guide

Preface

This document is for WeFlex product team members, especially with enginnering backgrounds. If you found any difficulty reading through it, please don't worry and read the next chapter.

For Non-Product Team Members

If you came from a non-product background, go ahead and read how to write down your ideas. This should serve you a picture about how to co-operate with the product team.

Write Down Your Ideas

Any improvement of our product may start as a very minimalistic sentense describing vaguely about the improvement. It is product manager's job to interview who came up with this idea and filling more details in it.

To begin with, you could go to Inbox board and under your list, add a card simply describe your problem. For example, I (Scott) want to request a new feature to improve our data analytics, so I went on Inbox and open a card:


.-------------------.  .------ ... (other lists)
|  Scott            |  |  Sean
| .---------------. |  |
| ' User behavior ' |  |
| ' analytics     ' |  |
| `---------------' |  |
| ... (other cards) |  |
|                   |  |

Product Tasks

TL;DR

Product development is never an easy job, yet we can always broke it down to tasks, which involves different kind and levels. A product task could be either a new feature, a enhancement, a technical issue or a bug.

All these tasks could be referenced as improvement in latter chapters.

Bugs

Bugs are not correctly implemented features.

Bugs are usually implementation problems. If some behavior is specified but not executed as our expection, then probably you have found a bug.

If reporter is not coming from a technical background (i.e. he is not a developer), ask the product manager to report the bug for you. Bugs get reported to github issues with detailed reports attached. In bug reports, reporter should provide a detailed procedure to reproduce the bug.

Fixing bugs

Depending on how critical the bug is and how difficult to fix it, product manager decides to fix it in either this cycle (aka. hot fix) or the next one. It is also product manager's job to assign bugs to developers.

Merging bug fixes

Once fixed, assignee usually puts his/her clean fix in a single commit, leaving a message about which bug this commit fixes and which Github issue this bug associates. Then assignee submits his bug fix as a pull request, merging from bug-fix branch to production branch. Assignee should always reference the bug issue in pull request description and then assign this pull request to proper developer, who either owning the repository, or working on it.

Each pull request requires at least one LGTM (looks good to me) or SGTM (seems good to me) comment to pass and get merged.

Technical Issues

Technical issues are not fully designed features.

Technical issues are spec problems. If set of bahaviors are designed but what happened in reality is not included, then probably you have found a technical issue.

Technical issues get reported to github issues with a report attached. Like bug reports, this report contains detailed information about how to reproduce the missing scenarios. Product manager is responsible for distinguishing bugs and technical issues and writing reports. Once reported, reporter should reference the github issue on related trello card(s) (if any).

Technical issues applies same fixing and merging strategies with bugs.

Enhancements

Enhancements are not properly designed features.

Enhancments are upcoming design problems. If a feature is designed but not in an appropriate form, then probably it is an enchancement to work on.

User stories for enhancements

Before review days, product manager is responsible doing

  1. collect analytic data;
  2. interview users;

to back up his (or someone else's) request of this enhancement.

He needs to reason why that

  1. current design is not the best;
  2. it worth time and money to do this improvement;

and compile them into a user story to help his co-workers to understand what exact problem this enhancement is to solve.

Difference between enhancements and technical issues

The major difference between enhancements and technical issues is that enhancements emphysis on not properly designed while the latter one emphsis on not fully designed.

New Features

Ah! A feature!

New features are usually new business problems. If a feature or function is designed and implemented at all, then it probably be a new feature (to work on).

A feature requires a user story, similar to the enhanment one.

Review Days

Review day is a meeting, hold at end of each cycle, to report and demo what product team has achieved in last cycle and plan for the next one.

Versions

Our major repos follows open-source versioning convention (aka, sementic versioning). At most cases, major version is stable at 1, minor version increases as cycle goes on and patch number iterates in each cycle from 1.

Developing, Testing, Staging and Deployment Strategies

Any finished improvement requires 4 stages in its lifecycle:

  1. Developing;
  2. Testing;
  3. Staging;

and finally,

  1. Production.

Staging Proposal

Once developer finished at least one improvement and he's feeling confident about what he had achieved, he can call for a staging proposal on github, merging from devel to master. Developer should list what items he had achieved during this pull request and ask for code-reviews.

Once passed code-review with at least one LGTM or SGTM, developer merges his proposal and push a version tag on HEAD. This will trigger and automated deployment on staging server (121.201.14.243).

> git tag v1.7.2;
> git push --tags

This pushes a v1.7.2 tag to github and thus trigger an automated deployment within 10 minutes.

Releasing

Once a cycle finished, we generate a staging proposal, containing everything we have achieved during this cycle and create a build. Product manager and testers take a good examine on this build for few days, with developers (if needed).

If testing passed, Scott will manual deploy the build to production server and checkout a git branch for that release.

References

  1. Richard White, How we use trello & google docs to make UserVoice better every day

  2. Stanislav Jonak, Kanban for software development